Three weeks. That is about as long as the wastewater treatment plant in Radolfzell, on the shores of Lake Constance, can operate without its sludge dewatering system. Beyond that, its available storage capacity would be exhausted, and a mobile dewatering unit would have to step in – bringing additional logistical challenges and considerable expense.

Careful preparation was therefore essential when two cranes arrived in mid-October 2026 to lift the Bucher press out of an upper floor of the plant building. As a precaution, both floors below had first been temporarily shored up, since the structural characteristics of the ageing building were not fully documented. For those responsible for the treatment plant, the lifting operation was one of the project's most demanding moments.

Yet the press was not being removed for good. Quite the opposite: after almost two decades of operation, it was undergoing a comprehensive technical overhaul. The reasons for that decision go back several years.

 

Proven technology, ageing components

Since 2007, the Bucher HPS 5005i has been responsible for dewatering digested sewage sludge at Radolfzell. For many years, it performed its duties reliably. Regina Eberle, who jointly heads the city's wastewater department with Michael Gnädig, has known the press from the very beginning. She was involved in the original dewatering trials alongside the plant manager at the time.

After approximately 15 years of largely trouble-free operation, however, signs of ageing became increasingly apparent. The control system and hydraulics were becoming outdated, replacement parts for older control components were proving harder to obtain, and communication with the plant's process control system was no longer entirely seamless.

Initially, a relatively straightforward solution seemed possible: upgrade the controls and hydraulics while continuing to operate the proven press. But a closer inspection revealed significant wear on the press shell as well. This changed the equation. A limited upgrade would no longer provide the long-term solution Radolfzell was looking for.

The city now faced a more fundamental question about the future of its sludge dewatering operation. Should it undertake a comprehensive retrofit, invest in a new Bucher press, or switch to a different dewatering technology altogether?

Radolfzell was determined not to make that decision based on quotations alone.

 

Three technologies put to the test

In summer 2025, three mobile dewatering systems were tested at the wastewater treatment plant using its own digested sewage sludge: a screw press, a decanter centrifuge and a Bucher pilot press.

Such trials are particularly valuable because sludge characteristics can vary considerably between treatment plants and under different operating conditions. Even within a single year, the dewaterability of sludge can change. For Radolfzell, it was therefore essential to establish how each technology performed with the material actually produced at the site.

All three systems would have met the plant's throughput requirements. The differences in dewatering performance, however, were more pronounced. According to Eberle, the Bucher technology once again achieved a higher dry-solids content than the two alternatives under the conditions tested. The results largely confirmed the wastewater department's experience from the original technology selection almost 20 years earlier.

Filtrate quality was another important consideration. Filtrate is the water separated from the sludge during dewatering and subsequently returned to the wastewater treatment process. In Radolfzell's trials, the screw press produced filtrate containing significantly more residual solids, which would have placed an additional load on the treatment process.

The trials provided an important basis for the decision. But technical performance alone could not determine an investment of this scale.

Michael Gnädig therefore prepared a comprehensive economic assessment. Alongside the initial investment, it considered future maintenance and replacement requirements, operating costs and consumables, anticipated price developments and sludge disposal costs.

Even relatively small differences in dewatering performance can have a substantial financial impact. According to the city's calculations, a difference of three to four percentage points in dry-solids content could translate into annual sludge disposal savings of approximately €30,000 to €50,000 under Radolfzell's operating conditions.

The existing infrastructure also played an important role. Retrofitting the Bucher press meant that pipework and other plant components could remain in use. The existing polymer preparation system could also be retained for the time being. Switching to a different dewatering technology, by contrast, would have required extensive modifications to the surrounding equipment. A completely new Bucher press would likewise have involved a significantly higher investment.

The combination of practical trials and a long-term economic assessment ultimately led to a clear decision: rather than replacing the existing Bucher press, Radolfzell would give it a comprehensive upgrade.

 

Modernising rather than replacing

For Bucher Unipektin, this decision involved far more than supplying new components. Working with the customer, its specialists had to assess which parts of the nearly 20-year-old machine could remain in service and where more extensive renewal was necessary.

Bucher Unipektin's sales team supported the evaluation of the technical options and the development of a suitable modernisation solution. The company's Customer Centre contributed its extensive experience with earlier generations of Bucher presses. In particular, the spare parts service team and specialists in installation and maintenance played important roles in planning and implementing the retrofit.

The result was a far-reaching overhaul of the Bucher HPS 5005i. Among the components replaced were the press shell, piston pressure plate and numerous mechanical wear parts. The upgrade also included a modern control system with a new operator interface, updated integration with the existing plant controls and the new Powerhydraulik HE hydraulic system.
The upgraded hydraulics are expected to reduce electricity consumption. The new control system offers modern operating and monitoring capabilities, while the use of current-generation components should improve spare parts availability over the longer term. Maintenance should also become easier thanks to the replacement and redesign of selected components.

For Radolfzell's wastewater department, however, dewatering performance remains the most important measure of success. In earlier years, the press had achieved annual average dry-solids contents of around 34%. Radolfzell hopes to return to similar performance levels. Eberle's objective is to achieve consistently stable results above 30%, even as sludge characteristics vary throughout the year, combined with high equipment availability and minimal maintenance requirements.

How the modernised press performs under actual operating conditions will become clear over time. The retrofit provides the foundation by renewing key components without having to replace the entire machine or its surrounding infrastructure.

This approach reflects a capability that Bucher Unipektin also applies across other industries. Rather than replacing existing machinery and processing equipment simply because of its age, Bucher assesses its condition and potential for modernisation. For a fruit juice press, that might mean upgrading the control system; for a filtration system, introducing modern membrane technology; or for an evaporator, converting to a more energy-efficient operating concept.

The technical solution differs from project to project, but the underlying principle remains the same: make sensible use of existing equipment and invest selectively where modernisation can deliver the greatest benefit.

 

A tight schedule for a major undertaking

In Radolfzell, the technical scope was only part of the challenge. The work also had to be carefully coordinated with the ongoing operation of the wastewater treatment plant.

In the weeks leading up to the planned shutdown, the operating team dewatered as much sludge as possible to free up storage capacity. Experience had shown that the plant could manage for approximately three weeks without the press. Two weeks were allocated to the main retrofit work, with commissioning scheduled to begin in the third.

Preparations extended well beyond the machine itself. Heavy components had to be removed from an older building and subsequently lifted back into place. This required temporary structural supports, complex crane logistics and particular attention to occupational safety.

Eberle recalls just how demanding the operation was: "We were very relieved when the press was back in place."

The remaining mechanical assembly, electrical connections and integration of the new control system followed. The work required close coordination between the wastewater treatment plant's operating team and Bucher's specialists. Detailed knowledge of the existing machine was just as important as expertise in the new technology.

One of the characteristics of a retrofit is that not every technical detail can be fully anticipated. This makes cooperation between the customer's wastewater department, Bucher's sales team and its Customer Centre all the more important – from the initial assessment and selection of components through to installation and recommissioning.

 

An investment in the years ahead

By the end of October 2026, the modernised Bucher press was back in operation. Following successful commissioning, Bucher Unipektin handed the HPS 5005i back to Radolfzell's wastewater department on schedule. The extensive overhaul had been completed within the planned shutdown window, without the need for a temporary mobile dewatering system.

For Regina Eberle and Michael Gnädig, this marks the beginning of the next phase: proving the modernised press in everyday operation. Their expectations are clear. They want it to deliver consistently good dewatering results and continue operating reliably, ideally for another ten years without major breakdowns.

Eberle has a clear recommendation for other wastewater treatment plants facing a similar investment decision: test the available technologies under real operating conditions and carefully evaluate the long-term costs – "not just on paper".

In Radolfzell, this approach has led to a solution that brings proven equipment and modern technology together. The Bucher press is back in its familiar position. Significant parts of its original structure remain, while the controls, hydraulics and key mechanical components have been renewed. After almost 20 years of service, the HPS 5005i is once again performing the task for which it was originally installed.

Author: Thorsten Nowak